• support@dumpspool.com
SPECIAL LIMITED TIME DISCOUNT OFFER. USE DISCOUNT CODE TO GET 20% OFF DP2021

PDF Only

$35.00 Free Updates Upto 90 Days

  • CSSBB Dumps PDF
  • 300 Questions
  • Updated On March 29, 2024

PDF + Test Engine

$60.00 Free Updates Upto 90 Days

  • CSSBB Question Answers
  • 300 Questions
  • Updated On March 29, 2024

Test Engine

$50.00 Free Updates Upto 90 Days

  • CSSBB Practice Questions
  • 300 Questions
  • Updated On March 29, 2024
Check Our Free ASQ CSSBB Online Test Engine Demo.

How to pass ASQ CSSBB exam with the help of dumps?

DumpsPool provides you the finest quality resources you’ve been looking for to no avail. So, it's due time you stop stressing and get ready for the exam. Our Online Test Engine provides you with the guidance you need to pass the certification exam. We guarantee top-grade results because we know we’ve covered each topic in a precise and understandable manner. Our expert team prepared the latest ASQ CSSBB Dumps to satisfy your need for training. Plus, they are in two different formats: Dumps PDF and Online Test Engine.

How Do I Know ASQ CSSBB Dumps are Worth it?

Did we mention our latest CSSBB Dumps PDF is also available as Online Test Engine? And that’s just the point where things start to take root. Of all the amazing features you are offered here at DumpsPool, the money-back guarantee has to be the best one. Now that you know you don’t have to worry about the payments. Let us explore all other reasons you would want to buy from us. Other than affordable Real Exam Dumps, you are offered three-month free updates.

You can easily scroll through our large catalog of certification exams. And, pick any exam to start your training. That’s right, DumpsPool isn’t limited to just ASQ Exams. We trust our customers need the support of an authentic and reliable resource. So, we made sure there is never any outdated content in our study resources. Our expert team makes sure everything is up to the mark by keeping an eye on every single update. Our main concern and focus are that you understand the real exam format. So, you can pass the exam in an easier way!

IT Students Are Using our Certified Six Sigma Black Belt Dumps Worldwide!

It is a well-established fact that certification exams can’t be conquered without some help from experts. The point of using Certified Six Sigma Black Belt Practice Question Answers is exactly that. You are constantly surrounded by IT experts who’ve been through you are about to and know better. The 24/7 customer service of DumpsPool ensures you are in touch with these experts whenever needed. Our 100% success rate and validity around the world, make us the most trusted resource candidates use. The updated Dumps PDF helps you pass the exam on the first attempt. And, with the money-back guarantee, you feel safe buying from us. You can claim your return on not passing the exam.

How to Get CSSBB Real Exam Dumps?

Getting access to the real exam dumps is as easy as pressing a button, literally! There are various resources available online, but the majority of them sell scams or copied content. So, if you are going to attempt the CSSBB exam, you need to be sure you are buying the right kind of Dumps. All the Dumps PDF available on DumpsPool are as unique and the latest as they can be. Plus, our Practice Question Answers are tested and approved by professionals. Making it the top authentic resource available on the internet. Our expert has made sure the Online Test Engine is free from outdated & fake content, repeated questions, and false plus indefinite information, etc. We make every penny count, and you leave our platform fully satisfied!

ASQ CSSBB Sample Question Answers

Question # 1

At a particular time, three components are in parallel and each has a reliability of 0.98. What is the reliability of the system?

A. 0.98
B. 0.94
C. 0.37
D. 0.26
E. none of the above

Question # 2

A process using a p-chart has pbar = 0.076 and nbar = 4.86. Find the control limits.

A. 0.069 and 0.083
B. 0.072 and 0.080
C. 0.040 and 0.112
D. 0.0756 and 0.0764
E. none of the above

Question # 3

A process shows the following number of defects. Each sample size for this process is85. 3 8 2 7 7 6 8 8 9 5What control chart should be used?

A. x-bar and R
B. median
C. individual and moving range
D. p
E. np
F. c
G. u
H. none of the above

Question # 4

Find the value of b or b0:

A. 3.33
B. –3.33
C. 4.08
D. –4.08
E. 1.24
F. –1.24

Question # 5

A set of data from a process has 8 readings per sample and 50 samples. The mean of the 50 sample means is 12.62. The mean of the 50 ranges is 0.18.Find the control limits for a median chart.

A. 12.52 and 12.72
B. 12.54 and 12.70
C. 0.02 and 0.33
D. none of the above

Question # 6

This QFD matrix was used in the design process for a ball point pen. What symbol is appropriate for the square labeled 10?

A.
B.
C.
D. none of the above

Question # 7

What percent of population falls below the lower specification limits?

A. 9.18%
B. 22.66%
C. 6.68 %
D. 1.83%

Question # 8

The team development stage characterized by expression of individual opinions and ideas often without regard for team objectives is known as:

A. performing
B. norming
C. conflicting
D. storming
E. brainstorming

Question # 9

This QFD matrix was used in the design process for a ball point pen. What symbol is appropriate for the square labeled 6?  

A. 
B. 
C. 
D. none of the above 

Question # 10

The test statistic is approximately:

A. 4.79
B. 6.71
C. 2.08
D. 5.44

Question # 11

Find the upper control limit for a range chart if n = 4 and the average range is 2.282.

A. 2.282
B. 4.564
C. 5.208
D. 3.423

Question # 12

The critical value(s) is/are: 

A. 1.645 
B. 1.96 
C. 1.645 
D. 1.96 

Question # 13

A complex system has many causes and effects. These may be illustrated on which of the following: 

A. matrix diagram 
B. cause and effect diagram 
C. process decision program chart 
D. affinity diagram 
E. activity network diagram 
F. tree diagram 
G. prioritization matrix 
H. matrix diagram 
I. interrelationship digraph 

Question # 14

An advantage of using standard deviation rather than range for measuring dispersion of a large sample is that:

A. standard deviation has a simpler formula
B. calculators have a standard deviation key but not a range key
C. standard deviation uses information from each measurement
D. range calculations are not normally distributed

Question # 15

The number of factors, levels and replications: 

A. 3, 3, 3 
B. 2, 3, 2 
C. 3, 2, 2, 
D. 3, 2, 3 
E. 2, 2, 2 
F. none of the above 

Question # 16

This QFD matrix was used in the design process for a ball point pen. What symbol is appropriate for the square labeled 12?

A.
B.
C.
D. none of the above

Question # 17

For a line in an FMEA form a team has established the following: Cost: $82 Severity: 7 Occurrence: 9 Detection: 4 Target date: 7 days What should the risk priority number (RPN) be for this line: 

A. 144,648 
B. 252 C. 1764 
C. 63 
D. none of the above 

Question # 18

A control chart is to be used to display the number of non-conducting diodes. Each point on the chart represent the number of bad diodes in a box of 1000. The appropriate control chart to use is: 

A. x-bar and R 
B. median 
C. individual and moving range 
D. p 
E. np 
F. u 
G. c 

Question # 19

Dr. W. Edwards Deming:

A. lectured in Japan after World War II
B. was an author of several books in the US
C. lectured widely in the US
D. is considered an expert in the quality field
E. all of the above
F. none of the above

Question # 20

A project whose definition does not include performance metrics: 

A. will typically be short term 
B. use statistical inference 
C. have a high risk of failure 
D. should not be approved 
E. none of the above 

Question # 21

Find the value of m or b1:

A. 0.25
B. 0.63
C. 0.75
D. 1.22

Question # 22

A process shows the following number of defectives. Each sample size for this process is 85.3 8 2 7 7 6 8 8 9 5 What control chart should be used? 

A. x-bar and R 
B. median 
C. individual and moving range 
D. p 
E. np 
F. c G. u H. none of the above 

Question # 23

A control chart will be used to monitor the number of scratches on a product. The following data have been collected: The appropriate control chart to use is:

A. x-bar and R
B. median
C. individual and moving range
D. p
E. np
F. u
G. c

Question # 24

If item A is more likely to be detected than item B which will have the highest Severity value? 

A. item A 
B. item B 
C. cannot be determined 

Question # 25

A process shows the following number of defectives. Each sample size for this process is 85.3 8 2 7 7 6 8 8 9 5 Find the control limits. 

A. none and 13.5 
B. 12.6 and 25.2 
C. none and 25.2 
D. none of the above 

Question # 26

An x-bar and R chart has four part measurements per sample The control limits on the averages chart are 2.996 and 3.256. Assume the process data form a normal distribution.What is the probability that the next plotted point falls outside the control limits? 

A. 0.00135 
B. 0.0027 
C. 0.0054 
D. none of the above 

Question # 27

A set of data from a process has 8 readings per sample and 50 samples. The mean of the 50 sample means is 12.62. The mean of the 50 ranges is 0.18.Find control limits for the R chart.

A. 0.10 and 0.25
B. none and 0.33
C. 0.02 and 0.33
D. none of the above

Question # 28

Find sd: 

A. 0.2875 
B. 0.3502 
C. 0.2714 
D. 0.2295 

Question # 29

Calculate the estimated variance of the population from which the following values have been randomly selected: 2.8 2.7 2.6 2.9 2.8 2.8 2.8: 

A. .095 
B. .009 
C. .088 
D. .008 

Question # 30

This QFD matrix was used in the design process for a ball point pen. What symbol is appropriate for the square labeled 8?  

A. 
B. 
C. 
D. none of the above 

Question # 31

A principle disadvantage of fractional factorial experimental designs is:

A. reduced cost
B. improved accuracy
C. confounding of effects
D. higher confidence level
E. reduced probability of type II errors

Question # 32

An assembly line has 3 × 3 squares painted behind each person. Signs indicate the parts and quantities that should be placed there. This is an example of:

A. visual factory
B. kanban
C. poka-yoke
D. standard work
E. set up time reduction (SMED)

Question # 33

A robust design is one which: 

A. has high reliability 
B. has low maintenance frequency 
C. is simple to manufacture 
D. is resistant to varying environmental conditions 

Question # 34

This QFD matrix was used in the design process for a ball point pen. What symbol is appropriate for the square labeled 14?

A.
B.
C.
D. none of the above

Question # 35

Find the value of (11) in the ANOVA table. Assume: 

A. Choices Not available (but this Question Answer E) 

Question # 36

This QFD matrix was used in the design process for a ball point pen. What symbol is appropriate for the square labeled 9?  

A. 
B. 
C. 
D. none of the above 

Question # 37

This QFD matrix was used in the design process for a ball point pen. What symbol is appropriate for the square labeled 4?

A.
B.
C.
D. none of the above

Question # 38

An full factorial experiment has three factors. Each factor has three levels. The number of test combinations or runs is: 

A. 9 
B. 6 
C. 27 
D. 36 
E. 33 

Question # 39

An example of a project metric would be:

A. the decrease in defect occurrence
B. the decrease in product cost
C. the decrease in cycle time
D. all the above

Question # 40

This QFD matrix was used in the design process for a ball point pen. What symbol is appropriate for the square labeled 2?

A.
B.
C.
D. none of the above

Question # 41

A population is bimodal with a variance of 5.77. One hundred samples of size 30 are randomly collected and the 100 sample means are calculated. The standard deviation of these sample means is approximately: 

A. 5.77 
B. 2.40 
C. 1.05 
D. 0.44 
E. 0.19 

Question # 42

A team wants to make a schedule for a project showing which tasks must be done sequentially and which may be done simultaneously. Which tool is most appropriate?

A. matrix diagram
B. cause and effect diagram
C. process decision program chart
D. affinity diagram
E. activity network diagram
F. tree diagram
G. prioritization matrix
H. matrix diagram
I. interrelationship digraph

Question # 43

An experiment has seven factors with two levels each. The experiment has eight runs. This experimental design is called: 

A. full factorial design 
B. half fractional factorial design 
C. interaction 
D. none of the above 

Question # 44

The following is a set of individual measurements:3 5 4 5 6 3 4 3 2 4 5 6 5 7 6 4 5 5 8 7 6 6 7 7 4Find the control limits for the individuals chart.

A. .7 and 11.2
B. 1.6 and 8.6
C. 2.7 and 7.5
D. none of the above

Question # 45

Find the value of (4) in the ANOVA table. Assume: 

A. 16.4
B. 3.2 
C. 18.6 
D. 23.2 
E. 4.54 
F. 12.2 
G.  0.10<P<1 
H. 2.82 
I. 1.48 

Question # 46

If the value of the test statistic had been 0.185, what action should have been taken regarding the null hypothesis?

A. rejected
B. accepted
C. none of the above
D. all of the above

Question # 47

Find Cp

A. 2.00
B. 0.56
C. 1.33
D. 0.44

Question # 48

Successful Six Sigma projects always:

A. use designed experiments
B. impact the bottom line of the enterprise
C. are completed in a short time frame
D. all of the above E. none of the above

Question # 49

The word “champion” in the context of Six Sigma projects refers to: 

A. the team that has had the most impact on the bottom line. 
B. the person who has coordinated teams most effectively 
C. the individual who has outpaced all others in six sigma knowledge 
D. none of the above 

Question # 50

“Robust design” refers to the ability of the product or service:

A. to function the same in different conditions
B. to remain strong
C. to last a long time
D. to have a high reliability

Question # 51

Samples of size n=36 are randomly selected from a population with mean = 125 and variance 12. Find the variance of the distribution of sample means. 

A. .333 
B. .577 
C. 2 
D. 3.464 
E. 12 

Question # 52

A team wants a technique for obtaining a large number of possible reasons for excess variation in a dimension. They should use: 

A. written and diagrammed work instructions 
B. flow charts and process maps 
C. cause and effect diagrams 
D. Pareto chart 
E. relationship matrix 

Question # 53

An x-bar and R chart has four part measurements per sample The control limits on the averages chart are 2.996 and 3.256. Assume the process data form a normal distribution. What is the probability that the next part measurement falls outside the control limits?

A. 0.00135
B. 0.0027
C. 0.0681
D. 0.1362
E. 0.2724
F. none of the above

Question # 54

Find the value of (9) in the ANOVA table. Assume

A. 16.4 
B. 3.2 
C. 18.6 
D. 23.2 
E. 4.54 
F. 12.2 
G. 0.525 
H. 2.82 
I. 1.48 

Question # 55

Dr. Joseph M. Juran:

A. lectured in Japan after World War II
B. was an author of several books in the US
C. lectured widely in the US
D. is considered an expert is the quality field
E. all of the above
F. none of the above

Question # 56

The null hypothsis should be:

A. rejected
B. not rejected
C. accepted

Question # 57

A higher resolution number for an experimental design indicates that: 

A. results are more clear 
B. confounding between main effects and interaction effects are less likely to be significant 
C. a higher number of replications have been used 
D. all factors have been tested at all levels 
E. the design is more balanced 

Question # 58

A newspaper article describes a high positive correlation between obesity and orange juice consumption among six-year-olds. Parents who restrict the use of orange juice for their children have:

A. made a type I error
B. made a type II error
C. misunderstood margin of error
D. confused correlation with causation

Question # 59

A team studies a coil steel banding process and makes five changes resulting in productivity improvements of 2%, 2.8%, 2.4%, 2% and 3% respectively. These improvements are best described by which approach to problem solving? 

A. 5S 
B. Poka yoke 
C. Kaizen 
D. PDCA 
E. Re-engineering 

Question # 60

A set of data from a process has 8 readings per sample and 50 samples. The mean of the 50 sample means is 12.62. The mean of the 50 ranges is 0.18.A customer requires that SPC charts be done on their forms which have spaces for only 5 readings per sample. What should be the UCL and LCL for tbe new averages chart?

A. 12.53 and 12.71
B. 12.58 and 12.66
C. 11.61 and 13.63
D. none of the above