How to pass BICSI DCDC-002 exam with the help of dumps?
DumpsPool provides you the finest quality resources you’ve been looking for to no avail. So, it's due time you stop stressing and get ready for the exam. Our Online Test Engine provides you with the guidance you need to pass the certification exam. We guarantee top-grade results because we know we’ve covered each topic in a precise and understandable manner. Our expert team prepared the latest BICSI DCDC-002 Dumps to satisfy your need for training. Plus, they are in two different formats: Dumps PDF and Online Test Engine.
How Do I Know BICSI DCDC-002 Dumps are Worth it?
Did we mention our latest DCDC-002 Dumps PDF is also available as Online Test Engine? And that’s just the point where things start to take root. Of all the amazing features you are offered here at DumpsPool, the money-back guarantee has to be the best one. Now that you know you don’t have to worry about the payments. Let us explore all other reasons you would want to buy from us. Other than affordable Real Exam Dumps, you are offered three-month free updates.
You can easily scroll through our large catalog of certification exams. And, pick any exam to start your training. That’s right, DumpsPool isn’t limited to just BICSI Exams. We trust our customers need the support of an authentic and reliable resource. So, we made sure there is never any outdated content in our study resources. Our expert team makes sure everything is up to the mark by keeping an eye on every single update. Our main concern and focus are that you understand the real exam format. So, you can pass the exam in an easier way!
IT Students Are Using our BICSI Data Center Design Consultant â?? DCDC Dumps Worldwide!
It is a well-established fact that certification exams can’t be conquered without some help from experts. The point of using BICSI Data Center Design Consultant â?? DCDC Practice Question Answers is exactly that. You are constantly surrounded by IT experts who’ve been through you are about to and know better. The 24/7 customer service of DumpsPool ensures you are in touch with these experts whenever needed. Our 100% success rate and validity around the world, make us the most trusted resource candidates use. The updated Dumps PDF helps you pass the exam on the first attempt. And, with the money-back guarantee, you feel safe buying from us. You can claim your return on not passing the exam.
How to Get DCDC-002 Real Exam Dumps?
Getting access to the real exam dumps is as easy as pressing a button, literally! There are various resources available online, but the majority of them sell scams or copied content. So, if you are going to attempt the DCDC-002 exam, you need to be sure you are buying the right kind of Dumps. All the Dumps PDF available on DumpsPool are as unique and the latest as they can be. Plus, our Practice Question Answers are tested and approved by professionals. Making it the top authentic resource available on the internet. Our expert has made sure the Online Test Engine is free from outdated & fake content, repeated questions, and false plus indefinite information, etc. We make every penny count, and you leave our platform fully satisfied!
Frequently Asked Questions
Question # 1
What is recommended size ratio of Secure Storage Area?
A. 5% of Computer Room Space
B. 10% or greater than Available Floor Space
C. 15-20% more than Computer Room's Cross Sectional Area
D. 10% of Computer Room's Net Square Footage
E. None Of These
Question # 2
What 3 standards books should be followed for data center grounding and bonding?
A. TIA 942, TIA 607 and IEEE 1100
B. UL 467, UL 96A and NFPA 70
C. TIA 568, ANSI/TIA-606-B and TIA 568-C.1
D. ASHRAE Standard 90.1, ASHRAE Standard 62.1 and ASHRAE Standard 55
Question # 3
what is typical entrance room power requirement?
A. 500, to 1500 watts per access provider
B. More than 2000 KW
C. exactly or less than 300KW
D. More than about Million watts
Question # 4
What level should the battery room be on?
A. Grade Level
B. Upper floor
C. Lower Floor
D. None
E. All
Question # 5
What level should the battery room be on?
A. Grade Level
B. Upper floor
C. Lower Floor
D. None
E. All
Question # 6
What is the clearance required for the hot aisle width?
A. 2 ft
B. 4 ft
C. 6 ft
D. 8 ft
Question # 7
What is the ASHRAE min and max dew point
A. 30F and 59F
B. 42F and 65F
C. 40F and 55F
D. -10°F to +85°F
Question # 8
What IBC occupancy category are data centers placed in?
A. Category 3
B. Category 4
C. Category5
D. category6
Question # 9
What electrical service feed options are there for a data center?
A. Single Entrance/Single Pathway
B. Single Entrance/Dual Pathway
C. Dual Entrance/Dual Pathway
D. All of the above
Question # 10
What are main concepts in choosing location of the entrance room?
A. If possible, it should be very close, and, in the computer room distance limitations forT1,T3,E1,and E3 circuits,
B. Should not be near to Data Center
C. Dedicated location outside building
D. All of these
Question # 11
where should engineering offices be located?
A. adjacent to equipment rooms they support
B. in a separate building
C. far away from the data center
D. inside computer room
Question # 12
What are two functions of telecommunications entrance room?
A. to provide a secure area where access provider outdoor cable can be converted, toindoor cable, and, house access provider owned equipment
B. to house all company-wide communication devices
C. to store backup telecommunication devices
D. none of these
Question # 13
What is the recommended range for the high temperature in a data center according to NEB?
A. 80 degrees
B. 75 degrees
C. 85 degrees
D. 70 degrees
E. 90 degrees
Question # 14
What room should have direct access to the computer room?
A. Break room
B. Server room
C. Network Operations Center (NOC)
D. Administrative office
Question # 15
What is the recommended amount of fuel supply needing to be available to a class F3 data center?
A. 24 hours
B. 48 hours
C. 72 hours
D. 96 hours
Question # 16
What is the recommended amount of fuel supply needing to be available to a class F2 datacenter?
A. 12 hours
B. 18 hours
C. 24 hours
D. 30 hours
E. 36 hours
Question # 17
What is the appropriate fire rating requirements for a critical media storage room?
A. 1 hour
B. 2 hours
C. 3 hours
D. 4 hours
Question # 18
What room should have its own dedicated air handling system apart from the computer room?
A. Electrical Room
B. Break Room
C. Printer Room
D. Storage Room
E. Telecommunications Room
Question # 19
What is the difference between a hard-wired and a plug-in UPS?
A. Hard-wired UPS is permanently connected to the electrical system while plug-in UPScan be easily connected and disconnected
B. Hard-wired UPS is more reliable than plug-in UPS
C. Plug-in UPS is more cost-effective than hard-wired UPS
D. Hard-wired UPS is more efficient in terms of power delivery than plug-in UPS
Question # 20
Where is temperature typically measured in a data center HVAC system?
A. At the CRAC unit exhaust
B. At the CRAC unit inlet
C. At the server rack inlet
D. At the server rack exhaust
Question # 21
what is the ANSI/TIA-942 recommended operational temperature
A. 60F to 75F
B. 68F to 77F
C. 80F to 90F
D. -10°C to +45°C
Question # 22
What is the recommended range of temperature for a data center?
A. 18-22°C (64-72°F)
B. 20-24°C (68-75°F)
C. 22-26°C (72-79°F)
D. 24-28°C (75-82°F)
E. 26-30°C (79-86°F)
Question # 23
What is the minimum aisle width?
A. 3 feet
B. The width shouldn't exceed more than half room length
C. Arm span distance between technicians
D. Twice server cabinet depth
Question # 24
What is the maximum recommended number of racks in an aisle?
A. 20 racks
B. 10 racks
C. 30 racks
D. 40 racks
Question # 25
What are three reasons for locating the power distribution unit outside the computer room?
A. removes maintenance item, removes a source of heat, allows P D U to occupy less expensive space
B. reduces cable congestion, prevents water damage, provides better access points
C. increases cooling efficiency, eliminates fire hazard, minimizes noise pollution
D. lowers electricity costs, improves network speed, enhances security measures
Question # 26
What type of power utility service is desired?
A. Overhead utility service
B. Underground or overhead utility service
C. Direct Current (DC) utility service
D. Renewable energy-based utility service
Question # 27
What is the recommended placement of electrical distribution sub systems
A. install in dedicated electrical rooms, or, locate outside the computer room with fire rated wall
B. install within the computer room space on raised floor
C. install within server racks
D. none of the above
Question # 28
What are the recommended grounding requirements for DC power systems?
A. Single point ground
B. Multiple point ground
C. Distributed ground
D. None of the above
Question # 29
When is a battery room required to have electrolyte spill containment and exhaust systems?
A. when the battery weight exceeds 500 pounds
B. When the ceiling suspended load capacity is below 20 pounds per square foot
C. when the potential for outgassing hydrogen exists
D. When corrosive fumes are detected in operation room
Question # 30
what is the best practice performance metric to gauge thermal compliance for ASHRAEand NEBS for a given data center
A. Temperature-Humidity Index (THI)
B. Airflow Efficiency Ratio (AFER)
C. Power Usage Effectiveness (PUE)
D. Computational Fluid Dynamics (CFD) modeling
Question # 31
What is the appropriate fire rating requirements for an ITE space?
A. 1/2 hour
B. 1 hour
C. 2 hours
D. 3 hours
Question # 32
What IBC occupancy category are data centers placed in if they don't have to operate after an earthquake?
A. Category1
B. Category2
C. Category3
D. Category 4